当前位置:IBM(000-237)题库

问题:

[单选]

During initial cluster planning session, a requirement is mandated that application monitoring will  Be used to monitor the production database and three application servers. Since all the application servers rely on the database being active, only one resource group has been planned to manage the starting/stopping of the cluster resources. 
How ill the initial design impact the use of application monitoring?()  

A .  Only one application server per resource group can be monitored.
B .  Process monitoring is part of RSCT and requires no special scripts.
C .  Any application can be monitored as long as it has an application server.
D .  Having all application servers in one resource group improves recovery time.

An administrator is attempting to recover afilesystem that fails to manually unmount. The fsck command produces the following output: The current volume is: /dev/fslv02 File system is currently mounted. Invalid file system size in the primary superblock. Invalid file system size in the secondary superblock. Primary superblock is corrupt. Secondary superblock is corrupt. fsck: Cannot continue tried to mount Which steps will resolve the problem?() Reboot the server into maintenance mode and run 'fsck' with the '-p' parameter while the filesystem is mounted。 Reboot the server into maintenance mode and run 'fsck' with the '-y' parameter whilethe filesystem is unmounted。 Force a umount of the filesystem with 'umount -F /dev/fslv02', and then run 'fsck p /dev/fslv02' while the file system is unmounted。 Force a umount of the filesystem by varying off the hosting volume group and then varyon the volume group. This will permit 'fsck -y' to be run against the failing filesystem。 以下关于SVC支持iSCSI的说明中,错误的是:() 自SVC5.1版本起支持主机用 iSCSI 访问 SVC;。 支持 ipv4 和 ipv6 的地址。 支持 CHAP 的 iSCSI 安全验证方式。 可将 iSCSI 存储加入到虚拟化存储环境。 L-O-R三通带压施焊时,焊条应选用() 酸性焊条。 碱性焊条。 合金焊条。 铸铁焊条。 餐厅的环境设计包括哪几个方面,有哪些要求? 元素是化学上具有相同()数的同一类原子的总称。 分子。 原子。 核电荷。 中子。

During initial cluster planning session, a requirement is mandated that application monitoring will  Be used to monitor the production database and three application servers. Since all the application servers rely on the database being active, only one resource group has been planned to manage the starting/stopping of the cluster resources. 
How ill the initial design impact the use of application monitoring?()  

参考答案:

  参考解析

本题暂无解析

在线 客服