问题:

[单选]

Project work packages are typically decomposed into smaller components called activities to provide a basis for()scheduling, executing, and monitoring and controllingthe proj ect work.

A . reviewing
B . estimating
C . auditing
D . expecting

The ()process ascertains which risks have the potential of affecting the project and documenting the risks' characteristics. Riskldentification。 Quantitative Risk Analysis。 Qualitative Risk Analysis。 Risk Monitoring and Control。 Developing the project schedule is often an iterative process. It determines the planned start and finish dates for project activities and milestones. Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to()progress. analyze。 track。 level。 extend。 船舶从事()活动,应当按照《中华人民共和国海事行政许可条件规定》的规定,取得海事管理机构的许可,并遵守相关操作规程,落实安全和防治污染措施。 ①在沿海港口进行舷外拷铲、油漆作业; ②使用焚烧炉; ③在港区水域内洗舱、清舱、驱气以及排放压载水的; ④冲洗沾有污染物、有毒有害物质的甲板的; ⑤船舶内部驳运燃油或污油水。 ①②③④⑤。 ①②③④。 ①③④⑤。 ①②③⑤。 Define Activities is the process ofidentifying the specific actions to be performed toproduce the() projectelements。 work drafts。 workpackage。 projectdeliverables。 During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised()are necessary. proceedings。 controls。 forecastings。 Prelibations。

Project work packages are typically decomposed into smaller components called activities to provide a basis for()scheduling, executing, and monitoring and controllingthe proj ect work.

参考答案:

  参考解析

该题的关键词为"scheduling、executing、monitoring、controlling",其语句结构为''Project work packages(主语)are typically decomposed into(谓语)smaller components",含义为"项目工作包通常被分解为更小的活动",分析后得知空白处的选项应该和上述的关键词为并列的词语,且顺序排列在其他的关键词之前,因而只能选择选项B,因为只有首先进行项目估算,才能制定项目进度,然后才能执行和监控,其他选项不符合题意。