The account team designed a p5-570 solution to strategically position the customer for future IBM announcements. The customer was dissatisfied upon implementing the solution. An AIX v5.1 partition was added to the requirements halfway through the solution design process and it was not considered in the final design. What should the pSeries technical specialist have done to prevent this situation?() Submitted an RPQ (Request for Quote) for AIX v5.1 support on a p5-570。 Designed a p670 because it supports AIX 5.1 partitions。 Initially designed a solution supporting AIX 5.1 partitions。 Gained customer approval for the final design prior to ordering the system。
实行施工平行发承包模式对建设工程项目组织与协调的影响表现在()。 业主直接控制所有工程的发包,可决定所有工程的承包商的选择。 业主要负责对所有承包商的管理及组织协调,工作量大,对业主不利。 业主的对立面多,各个合同之间的界面多,关系复杂,矛盾集中,业主的管理风险大。 业主方可能需要配备较多的人力和付出较多的精力进行管理,管理成本高。 组织和协调工作量大大减小,协调比较容易。
Company.com wishes to use IPAT via IP replacement in a two-node mutual cluster. Each node has two Ethernet 10/100/1000 adapters. Throughout the planning session,the customer has asked questions about subnet and VLAN requirements for the intended network topology. Which of the following best describes the network requirements?() The service IP addresses must be on a separate subnet and VLAN.。 The non-service and service IP addresses must be on the same subnet and on the same VLAN.。 All interfaces on a node must be in different subnets. All subnets must be on the same VLAN. 。 One non-service and one service IP address must be on the same logical subnet. All interfaces must be on the same VLAN.。
下列哪项组合是错误的() AT-Ⅲ:C增高见于血友病,白血病,口服抗凝药。 AT-Ⅲ:C减低见于DIC,肝脏疾病,口服避孕药。 α2-M增高见于慢性肾小球病,炎性反应,自身免疫性疾病。 α2-M减低见于恶性肿瘤,肝病。
Companycom is about to purchase a POWER5 Enterprise server which requires two Ethernet ports and two disks for each of the four LPARs. It has been configured and validated using the IBM eConfig tool. Which of the following is very important to verify in addition to the eConfig validation?() Total number of SCSI adapters。 Total number of Ethernet adapters。 Total number of Ethernet adapters and number of SCSI paths per LPAR。 Total number of SCSI paths available and total number of SCSI adapter。
A System p administrator found a process on the server that should be stopped.
Which of the following commands can be used to list all the signal actions defined for this process()