A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?() In the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.。 In the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.。 In the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.。 In the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.。
Which of the following kdb subcommands should be entered to obtain information about a serial port?() tty。 stat。 trace。 stream。
The account team designed a p5-570 solution to strategically position the customer for future IBM announcements. The customer was dissatisfied upon implementing the solution. An AIX v5.1 partition was added to the requirements halfway through the solution design process and it was not considered in the final design. What should the pSeries technical specialist have done to prevent this situation?() Submitted an RPQ (Request for Quote) for AIX v5.1 support on a p5-570。 Designed a p670 because it supports AIX 5.1 partitions。 Initially designed a solution supporting AIX 5.1 partitions。 Gained customer approval for the final design prior to ordering the system。
A System p administrator found a process on the server that should be stopped. Which of the following commands can be used to list all the signal actions defined for this process() ps。 pstat。 lssig。 procsig。
A system administrator would like to rename volume group oldvg to newvg. This volume group resides on hdisk1. What is the appropriate procedure to perform this?() reboot the server in maintenance mode;migratevg -y newvg oldvg;reboot the server in normal mode。 unmount all filesystems in the volume group;varyoffvg oldvg;migratepv -y oldvg -n newvg varyonvg newvg。 unmount all filesystems in the volume group;varyoffvg oldvg;exportvg oldvg;importvg -y newvg hdisk1;mount all。 unmount all filesystems in the volume group;varyoffvg oldvg;for each logical volume in the volume group do cplv -v oldvg -y newvg;varyonvg newvg;mount all。
Company.com wishes to use IPAT via IP replacement in a two-node mutual cluster. Each node has two Ethernet 10/100/1000 adapters. Throughout the planning session,the customer has asked questions about subnet and VLAN requirements for the intended network topology.
Which of the following best describes the network requirements?()