A server will not boot and the administrator needs to run fsck on the filesystems to verify their integrity. Installation media and diagnostic media is unavailable and there is no NIM master defined in this environment. How would the administrator bring the system up to be able to run fsck on all the filesystems?() Boot from the IBM Disaster Recovery boot server thru the network.。 Installation media or diagnostics media is required to acquire the rootvg.。 Boot to maintenance mode, enter a limited function shell, and execute getrootfs hdisk0.。 Hold space bar at boot time to automatically initiate a limited function shell, then enter getrootfs hdisk0.。
元认知
You have not configured Oracle Managed Files (OMF) in your database. You do not want to scan the entire datafile every time an incremental backup is performed. You decide to enable the block change tracking feature. Which statement should you use to enable the block change tracking feature?() ALTER DATABASE ENABLE BLOCK CHANGE TRACKING;。 ALTER SYSTEM ENABLE BLOCK CHANGE TRACKING USING FILE <path>;。 ALTER DATABASE ENABLE BLOCK CHANGE TRACKING USING FILE <path>;。 ALTER SYSTEM ENABLE BLOCK CHANGE TRACKING。
《最高人民法院关于审理偷税抗税刑事案件具体应用法律若干问题的解释》规定,纳税人实施下列()行为之一,不缴或者少缴应纳税款,偷税数额占应纳税额的百分之十以上且偷税数额在一万元以上的,依照刑法第二百零一条第一款的规定定罪处罚。 伪造、变造、隐匿、擅自销毁帐簿、记帐凭证。 在帐簿上多列支出或者不列、少列收入。 经税务机关通知申报而拖延申报纳税。 进行虚假纳税申报。
Company.com recently updated the programs used in an HACMP pre-event. The procedure Involved coping the new code over the old code in the appropriate directory on one of the nodes as indicated by the HACMP event entry. The cluster was synchronized. During a fallover test,the backup system did not behave as expected.What is the most likely problem?() The new pre-event program was node locked to a hostname。 The new pre-event program was not made executable on al nodes.。 The new pre-event program was not compatible with the backup machine.。 The new pre-event program was not propagated to all the nodes in the cluster.。
A customer left a message on the pSeries technical specialist’s voicemail that a proposal is needed for a p5-550 4-way 1.4GHz 8GB machine. The specialist configured a p5-570 4-way 1.5GHz 8GB machine and sent it to the customer with a note that this system was the closest match to that requested.could the specialist have done to minimize any customer dissatisfaction in an efficient manner?()