()就是要依据企业现存或采购的材料尺寸规格对零件的材料下料进行优化,以期提高材料利用率 ["A.下料优化设计 ","B.钢筋下料设计 ","C.构件设计 ","D.施工设计"]
服从建设单位的协调管理,接受监理单位的监督与指导,这属于水利水电工程施工进度计划的()。 ["A.组织措施 ","B.合同措施 ","C.技术措施 ","D.经济措施"]
Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition, the customer was told that there are certain limitations that must be observed. What are these limitations?() ["When the i5\/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter\/disk is available from internal hardware. ","V5R3 and later releases of i5\/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5\/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions. ","When the i5\/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5\/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions. ","V5R3 and later releases of i5\/OS can be installed on IBM eServer p5 servers. i5\/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I\/O subsystem."]
Your developers have asked you to restore the development database, which is in NOARCHIVELOG mode, back to last Tuesday the 20th. Your last backup is from Monday the 19th. What do you do?() [" Restore the 19ths backup, restore all archived redo logs, recover the database to the 20th,and open the database."," Tell them that their request cannot be met with the current backup strategy."," Restore the 19ths backup, apply the online redo logs,and open the database."," Switch the database into ARCHIVELOG mode,restore the 19th’s backup,restore all archived redo logs,and recover the database to the 20th."," Use the recover database command to roll back the database from today to the 19th of the month."]
施工阶段成本控制的要求有() ["人工费的控制","材料费的控制","施工机械使用费控制","施工分包费用的控制","规划费的控制"]
简述小企业进行人才开发的优势与劣势。