时花养护质量标准 正确。 错误。
While upgrading an existing x445 with a second SMP expansion module and four processors, a technician notices the SMP connector cables are missing on the back, so the technician connects the cables. Upon powering up, the technician notices the upper SMP expansion module is disabled. Which of the following is the most likely cause of the problem?() 正确。 错误。
变压器短路实验常在高压侧进行,其原因是()。 正确。 错误。
锅炉排污的目的是(),排污的方式有()、()。 正确。 错误。
ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical specialist perform to set the service processor network address for a static IP?() 正确。 错误。
设计单位不应当考虑施工安全操作和防护的需要,对涉及施工安全的重点部位和环节在设计文件中注明,并对防范生产安全事故提出指导意见。