Company has a Catalyst 6500 and you need to configure redundancy between the supervisormodules. With route processor redundancy (RPR+), the redundant supervisor engine is fullyinitialized and configured, which shortens the switchover time if the active supervisor engine fails.Which three statements are true about the RPR + operations when the redundant supervisorengine switched over the failed primary supervisor engine?() ["Static IP routes are maintained across a switchover because they are configured from entries inthe configuration file","Information about dynamic routing states, maintained on the active supervisor engine, issynchronized to the redundant supervisor engine and is transferred during the switchover","Information about dynamic routing states, maintained on the active supervisor engine, is notsynchronized to the redundant supervisor engine and is lost on switchover","The Forwarding Information Base (FIB) tables are cleared on a switchover. As a result, routedtraffic is interrupted until route tables reconverge","Static IP routes are cleared across a switchover and recreated from entries in the configurationfile on the redundant supervisor engine","The Forwarding Information Base (FIB) tables are maintained during the switchover. As aresult, routed traffic continues without any interruption when the failover occur"]
常用的产酶微生物
光纤分布式数据接口(FDDI)属于() ["光纤网络","令牌环网","总线网","星\/树型网"]
资金的时间价值是资金随着时间的推移而产生的增值部分。
建设项目的安全卫生评价工作,应在工程可行性研究阶段进行,由建设单位自主选择本建设项目设计单位以外的、有()承担,并与之签订书面委托合同。 ["安全卫生评价经历的单位","安全卫生评价经验的单位","安全卫生评价技术的单位","安全卫生评价资格的单位"]
复述筒式导轴承(外冷式)工作过程。