当前位置:CCNP(642-832)题库

问题:

[多选] Company has a Catalyst 6500 and you need to configure redundancy between the supervisormodules. With route processor redundancy (RPR+), the redundant supervisor engine is fullyinitialized and configured, which shortens the switchover time if the active supervisor engine fails.Which three statements are true about the RPR + operations when the redundant supervisorengine switched over the failed primary supervisor engine?()

A . Static IP routes are maintained across a switchover because they are configured from entries inthe configuration file
B . Information about dynamic routing states, maintained on the active supervisor engine, issynchronized to the redundant supervisor engine and is transferred during the switchover
C . Information about dynamic routing states, maintained on the active supervisor engine, is notsynchronized to the redundant supervisor engine and is lost on switchover
D . The Forwarding Information Base (FIB) tables are cleared on a switchover. As a result, routedtraffic is interrupted until route tables reconverge
E . Static IP routes are cleared across a switchover and recreated from entries in the configurationfile on the redundant supervisor engine
F . The Forwarding Information Base (FIB) tables are maintained during the switchover. As aresult, routed traffic continues without any interruption when the failover occur

简述梭伦改革的背景、措施以及意义。 Your company has a single Active Directory forest that has six domains.All DNS servers in the forest run Windows Server 2008 R2.You need to ensure that all public DNS queries are channeled through a single-caching-only DNS server.Which two actions should you perform?() Disable the root hints.。 Enable BIND secondaries.。 Configure a forwarder to the caching DNS server.。 Configure a GlobalNames host (A) record for the hostname of the caching DNS server.。 数据库管理系统是对数据库进行管理的软件,位于()之间。 光纤分布式数据接口(FDDI)属于() 光纤网络。 令牌环网。 总线网。 星/树型网。 品位、边界品位及工业品位的概念及应用。 Company has a Catalyst 6500 and you need to configure redundancy between the supervisormodules. With route processor redundancy (RPR+), the redundant supervisor engine is fullyinitialized and configured, which shortens the switchover time if the active supervisor engine fails.Which three statements are true about the RPR + operations when the redundant supervisorengine switched over the failed primary supervisor engine?()
参考答案:

  参考解析

本题暂无解析