当前位置:1Z0-053题库

问题:

[单选] You have backed up your database twice without connecting to the recovery catalog. What command do you issue to transfer the control-file metadata to the recovery catalog?()

A .  synch catalog
B .  resync catalog
C .  replicate catalog
D .  update catalog
E .  restore catalog

A customer has four AIX partitions that require a SAN. The disk subsystem must replicate to aremote site via an IP network. Each site has two Cisco MDS 9509 directors with fibre channel linecards. Which of the following must be added to each director to meet the IP requirement?() tri-rate SFP。 update to the latest Cisco IOS。 FCIP activation on the existing 16 FC line cards。 Multiprotocol Services Module with FCIP activatio。 绩效评估 A bank has requested proposals for a storage solution to implement disaster recovery processes for their IBM System z configured with Linux, IBM System p configured with AIX, and Microsoft Windows environments. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, and FlashCopy. Floor space is limited. What hardware platform provides this native support?() IBM XIV Storage System。 IBM System Storage DS5300。 IBM System Storage DS8800。 IBM System Storage DS5020 with SVC。 《中华人民共和国中小企业促进法》是在()通过的。 2000年。 2001年。 2002年。 2003年。 某房地产开发公司兴建住宅楼工程。招标文件规定,工程为砖混结构,5层,工期265日,固定总价合同模式。至投标阶段工程施工图设计尚未全部完成。在此过程中发生如下事件: 事件一:施工单位中标价格为1350万元。但是经双方3轮艰苦谈判,最终确定合同价为l200万元,并据此签订了施工承包合同。 事件二:在投标过程中,某施工单位未到现场进行勘察,认为工程结构简单并且对施工现场、周围环境非常熟悉,另外考虑工期不到一年,市场材料价格不会发生太大的变化,于是按照企业以往积累的经验编制标书。 事件三:部分合同条款中规定:l.施工单位按照开发公司批准的施工组织设计组织施工,施工单位不承担因此引起的工期延误和费用增加责任。 2.开发公司向施工单位提供场地的工程地质和主要管线资料,供施工单位参考使用。事件一中开发公司的做法是否正确?为什么? You have backed up your database twice without connecting to the recovery catalog. What command do you issue to transfer the control-file metadata to the recovery catalog?()
参考答案:

  参考解析

本题暂无解析

相关题目:

在线 客服