An administrator is planning a two node cluster containing Node1 and Node2 with a single resource groupnamed RG1. RG1 startup policy will be ’Online on Home Node only’. The home node is Node1. If RG1 fails over to Node2 itmust fall back to Node1. Fall back must take place outside of business hours. The agreed time for fall back is20:00. How will this be achieved with minimum action taken by administrator?() Configure the resource group with a fallback policy of "Fallback to Higher Priority Node" Restart Node1 at20:00。 Configure the resource group with a fallback policy of "Never Fallback" Manually move the resource groupfrom Node2 to Node1 at 20:00。 Configure the resource group with a fallback policy of "Fallback To Higher Priority Node" Create a"Delayed Fallback Timer" policy to meet the requirements Allocate this delayed timer policy to theresource group RG1。 Configure the resource group with a fallback policy of "Never Fallback" Create a "Delayed Fallback Timer"policy to meet the requirement Specify this delayed timer policy as a "Fallback Override" to the resourcegroup RG1。
人盯人防守战术的优点是以()、()、();便于发挥队员的防守积极性和提高责任感。
如何有步骤地撰写商业计划?
An application vendor wants to choose a fault tolerant platform for their new application. The application benefits from multiple processors and has been tested on Red Hat Advanced Server 3. To determine the memory requirements for the application, which of the following is the best procedure?() The application should be tested and baselines should be measured with simulated user loads.。 The application should be tested with the minimum amount of memory then increase the memory in increments until an acceptable response is achieved.。 The application should be tested with differing amounts of memory and the fastest response time is reached it should be used as the acceptable configuration.。 The application should be tested with the maximum amount of memory then decrease the memory in increments until an acceptable price/performance ratio is reached.。
失业人员失业前用人单位和本人累计缴费十年以上的,领取失业保险金的期限最长为二十个月。
根据《水利工程建设安全生产管理规定》,项目法人应当组织制定()应急救援预案,应定期组织演练。