当前位置:CCNP(642-902)题库

问题:

[单选]

Refer to the exhibit. Which statement is true? ()

A . Only traffic with a destination from 10.10.0.0/19 will be permitted.
B . Router RAR1 will accept only route 10.10.0.0/19 from its BGP neighbor.
C . Only traffic going to 10.10.0.0/19 will be permitted.
D . Router RAR1 will send only route 10.10.0.0/19 to its BGP neighbor.

The routers named Testking1 and Testking2 are both configured with RIP only.What will happen in the event of Testking1 receiving a routing update that contains a higher cost path to a network already in its routing table?() The update information will be added to the existing routing table.。 The update information will replace the existing routing table entry.。 The update will be ignored and thus no further action will occur.。 The existing routing table entry will be purged from the routing table and all routers will attempt convergence.。 下列哪一项不属于由不同深度的计划构成的进度计划系统()。 施工总进度计划。 各分包商编制的分包工程施工进度计划。 子项目施工进度计划。 子项目中的单项工程施工进度计划等。 夏尔丹是()的写实画家。 19世纪。 18世纪。 17世纪。 20世纪。 合理的知识结构在于既能满足专业和社会生活的需要,又有自己的独特之处。但总的要求应该是()。 博而不杂。 专而精深。 基础扎实。 适应性宽。 按照我国现行工程造价构成的规定,下列属于工程建设其他费用的是() 基本预备费。 稅金。 建设期贷款利息。 与未来企业生产有关的其他费用。

Refer to the exhibit. Which statement is true? ()

参考答案:

  参考解析

本题暂无解析

在线 客服