某施工单位编制的某工程网络图,如图2-11所示,网络进度计划原始方案各工作的持续时间和估计费用,见下表。

各工作持续时间和估计费用

若该网络进度计划各工作的可压缩时间及压缩单位时间增加的费用,见下表。确定该网络进度计划的最低综合费用和相应的关键路线,并计算调整优化后的总工期(要求写出调整优化过程)。
各工作的可压缩时间及压缩单位时间增加的费用表

 

液压动力部分是将()。 ["机械能转化为液压能","电能转化为机械能","液压能转化为机械能","电能转化为液压能"] 建设学习型政党,提高全党思想政治水平,是()《决定》提出的一项重大而紧迫的战略任务。 ["党的十七大","党的十七届四中全会","党的十八大","党的十八届四中全会"] 心理健康的一般标准是什么? Refer to the exhibits. Router B should advertise the network co nnected to the E0/0/0 interface to router A and block all other network advertisements. The IP routing table on router A indicates that it is not receiving this prefix from router B. What is the probable cause of the problem?() [" An access list on router B is causing the 192.168.3.16\/28 network to be denied"," An access list on router B is causing the 192.168.3.32\/28 network to be denied"," The distribute list on router B is referencing a numbered access list that does not exist on router B"," The d istribute list on router B is referencing the wrong interface"] ISP是

某施工单位编制的某工程网络图,如图2-11所示,网络进度计划原始方案各工作的持续时间和估计费用,见下表。

各工作持续时间和估计费用

若该网络进度计划各工作的可压缩时间及压缩单位时间增加的费用,见下表。确定该网络进度计划的最低综合费用和相应的关键路线,并计算调整优化后的总工期(要求写出调整优化过程)。
各工作的可压缩时间及压缩单位时间增加的费用表

 

参考答案:

  参考解析

本题暂无解析