当前位置:高级信息系统项目管理师题库>信息系统项目管理师综合练习题库

问题:

[单选] The uncertainty of an event is measured by its probability of occurrence and is inversely proportional to that. The more uncertain an event is. The more information is required to resolve uncertainty of that event. The amount of information is measured in ()

A . A、possibility
B . B、bits
C . C、bps
D . D、probability

面向对象开发方法主要分为分析、设计和实现三个阶段,下面属于分析阶段主要工作的是() A、定义子系统接口参数 。 B、编写代码 。 C、改进系统的性能 。 D、建立用例模型。 根据软件生命周期的V模型,系统测试主要针对(),检查系统作为一个整体是否有效地得到运行 A、概要设计 。 B、项目范围说明书 。 C、项目管理计划 。 D、需求规格说明书。 The intention of the()is to schedule, organize and control all activities to achieve the project goal eventually.no matter how difficult it is and what kind of risks are there. A、project work breakdown。 B、project security authentication。 C、project management。 D、project flowchart。 Each machine in the internet is assigned a unique network address,called(),that is used to identify the machine for communication purposes A、MAC address。 B、IP address。 C、host address。 D、domain name address。 某部委邀请55位专家对5个项目A、B、C、D、E进行投票评选,要求按某种常用的规则从中选出优秀项目(可以由若干个项目并列优秀)。每个专家经过独立仔细研究,在自己的心目中都对这五个项目进行了优选排序(如下表): 例如,有18位专家对项目的优选排序都是ADECB,依次类推。 常用的五条选优规则如下: 规则甲:只进行一轮投票,选出得票最多的项目 规则乙:进行两轮投票,第一轮投票先选出得票最多和次多的两个(或多个)项目,再在这些项目之间让全体专家进行第二轮投票,选出得票最多的项目。 规则丙:进行多轮投票,每一轮投票淘汰得票最少的项目 规则丁:进行多次两项目对决投票,分别对所有各对(两个)项目进行优选投票,最后,胜选次数最多的项目就作为优秀项目。根据该规则,选出了项目E 规则戊:每位专家对每个项目进行评分,分别以5、4、3、2、1分评给自己心中优选出来的第1、2、3、4、5个项目,最后,汇总统计各个项目的得分总和,选出最高得分的项目。 该部委依据上述各个规则,组织专家进行项目评选,假设各位专家都完全按自己心目中的项目优选排序进行选择投票,并且没有弃权情况,则针对评选结果,()结论正确。 A、按规则甲和乙,都选出了项目A 。 B、按规则丙,选出了项目B 。 C、按规则丁和戊选出了项目E 。 D、按这五条规则分别选出了不同的项目。 The uncertainty of an event is measured by its probability of occurrence and is inversely proportional to that. The more uncertain an event is. The more information is required to resolve uncertainty of that event. The amount of information is measured in ()
参考答案:

  参考解析

相关题目:

在线 客服