The Automatic Shared Memory Management feature is enabled for the PROD database. Currently, a lot of insert activity is taking place in the database, and the memory structures are allocated according to the database workload. As the workload reduces, you decide to perform batch jobs in the database. Which of the following initialization parameters are NOT automatically resized according to the new workload and continue to remain unchanged?() LOG_BUFFER。 DB_CACHE_SIZE。 JAVA_POOL_SIZE。 LARGE_POOL_SIZE。 SHARED_POOL_SIZE。 STREAMS_POOL_SIZE。
杂草对草坪的危害
以下关于建设部《建筑业企业资质管理规定实施意见》明确《建筑业企业资质等级标准》中涉及水利方面的资质不正确的选项是()。 水工建筑物基础处理工程专业承包企业资质。 河湖整治工程专业承包企业资质。 堤防工程专业承包企业资质。 桥梁工程专业承包企业资质。
A customer wants to implement the Software Inventory capabilities of IBM Director in their environment of 50 servers, 500 laptops and 150 desktops.Which of the following would represent a minimum valid configuration to support this solution?() Windows 2000 server with 2GB free space, 2GB RAM and dual 1 GHz proc, using Access 2003。 Linux with 2.6 kernel and 2GB free space, 2GB RAM and dual 1 GHz proc, using MySQL。 Windows 2000 server with 2GB free space, 2GB RAM, dual 1 GHz proc with SMBIOS using MS Jet database。 Windows 2003 server with 2GB free space, 2GB RAM, dual 1 GHz proc with SMBIOS using MS SQL database。
当机械的主激励频率低于支承系统一阶固有频率的支承称为:()。 刚性支承。 弹性支承。 柔性支承。
Which of the following NLS_SORT parameter values would result in case-insensitive and accent-insensitive binary sorts?()