当前位置:IBM(000-102)题库

问题:

[单选]

A customer is interested in using two Power 550 servers to implement a new two node cluster. The cluster willbe using SAN attached disk for shared storage and will be attached to one IP network. Which of the followingadapter configurations will meet the customer requirements while reducing single points of failure?()

A . A
B . B
C . C
D . D

An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix? () Add Rear Door Heat eXchanger 。 Add fans to the top of the racks 。 Increase circulation from Data Center raised floor 。 Change to perforated door。 电子商务法的基本框架应当由《电子商务法》与配套的法律规范构成,配套法律规范大致包括() 电子商务经营法律规范。 电子合同法律规范。 电子签名法律规范。 安全认证法律规范。 电子支付法律规则。 What is the maximum number of nodes that can be configured in a single PowerHA cluster?() 16。 32。 64。 128。 驾驶员如何预防疲劳和疲劳驾驶 某水闸共10孔,每孔净宽10.0m。底板厚1.6m,闸室总宽112.8m,顺水流长16.Om;闸室及翼墙底板基础采用水泥土搅拌桩处理。其主要工程内容有:①地基与基础;②闸室段(土建);③上游连接段;④下游连接段;⑤消能防冲段;⑥交通桥(工作桥);⑦金属结构及启闭机安装;⑧启闭机房和桥头堡。施工过程中,发生如下事件: 事件1:水泥土搅拌桩在施工前进行了2根工艺性试验桩,确定了施工参数。 事件2:水泥土搅拌桩施工完成后,施工单位对基坑进行了开挖,按规范要求对水泥土搅拌桩进行了检测。检测合格后,施工单位组织项目法人、监理、设计、质量监督、运行管理等单位组成联合小组,共同检查核定其质量等级并填写签证表。 事件3:水闸闸墩施工正值高温季节,为此,施工单位采取了多项温控措施保证混凝土施工质量。 事件4:本工程共划分为1个单位工程。单位工程完成后,监理单位组织项目法人、设计、施工、运行管理、质量监督等单位组成外观质量评定小组,现场进行工程外观质量检验评定,并将评定结论报工程质量监督机构核备。 事件4中有何不妥之处?并改正。若外观质量得分率为85%,本单位工程施工质量如果评定为优良等级,还需具备哪些条件

A customer is interested in using two Power 550 servers to implement a new two node cluster. The cluster willbe using SAN attached disk for shared storage and will be attached to one IP network. Which of the followingadapter configurations will meet the customer requirements while reducing single points of failure?()

参考答案:

  参考解析

本题暂无解析

相关题目:

在线 客服