You have an Exchange Server 2010 server that has the Mailbox, Hub Transport, and Client Access server roles installed. You need to ensure that users can send and receive e-mail by using Windows Live Mail or Microsoft Outlook Express. What should you do on the server()? ["Install and then configure the SMTP server feature.","Start the Microsoft Exchange POP3 service and then set the startup type to Automatic.","Modify the properties of the MSExchangePOP3 (TCP-in) Windows Firewall rule.","Modify the properties of the MSExchangeMailSubmission - RPC (TCP-in) Windows Firewall rule."]
均衡价格
You need to create a new VLAN on your Catalyst switch. This VLAN is to be named TESTKING. Which of the following need to be completed for the creation of this new VLAN?() [" The TESTKING VLAN must be created."," The desired ports must be added to the new TESTKING VLAN."," The TESTKING VLAN must be added to all of the domains."," The TESTKING VLAN must be named."," An IP address must be configured for the TESTKING VLAN."," None of the above. VLAN creations are automatic."]
许可审核机关应当对申请企业哪些场所设施进行现场实地考察?
You use Microsoft .NET Framework v3.5 to create a Microsoft ASP.NET application forCertkiller.com. The code segment below is written to create a client-script function. (The line numbers is includedfor reference purposes) 1 function updateLabelControl(labelId, newText) { 2 var label = $find(labelId); 3 label.innerHTML = newText; 4 } This newly created script will make use of ASP.NET AJAX. The script will also update the text ofall the Label controls in the web form. It has come to your attention that the Label controls are notupdated when the client script function is tested. However, you receive the"’null’ is null or not anobject" JavaScript error message in the browser. What should you do?() ["A","B","C","D"]
某办公大楼由主楼和裙楼两部分组成,平面呈不规则四方形,主楼29层,裙楼4层,地下2层,总建筑面积81650m2。该工程5月份完成主体施工,屋面防水施工安排在8月份。屋面防水层由一层聚氨酯防水涂料和一层自粘SBS高分子防水卷材构成。裙楼地下室回填土施工时已将裙楼外脚手架拆除,在裙楼屋面防水层施工时,因工期紧没有搭设安全防护栏杆。 工人王某在铺贴卷材后退时不慎从屋面掉下,经医院抢救无效死亡。 裙楼屋面防水施工完成后,聚氨酯底胶配制时用的二甲苯稀释剂剩余不多,工人张某随手将剩余的二甲苯从屋面向外倒在了回填土上。主楼屋面防水工程检查验收时发现少量卷材起鼓,鼓泡有大有小,直径大的达到90mm,鼓泡割破后发现有冷凝水珠。经查阅相关技术资料后发现:没有基层含水率试验和防水卷材粘贴试验记录;屋面防水工程技术交底要求自粘SBS卷材搭接宽度为50mm,接缝口应用密封材料封严,宽度不小于5mm。
试分析卷材起鼓原因,并指出正确的处理方法。