当前位置:内河船员考试题库>驾驶台资源管理题库

问题:

[单选] 根据《中华人民共和国船舶及其有关作业活动污染海洋环境防治管理规定》,以下说法有误的:()

A . 船舶应当配备有盖、不渗漏、不外溢的垃圾储存容器,或者对垃圾实行袋装。
B . 船舶应当对垃圾进行分类收集和存放,对含有毒有害物质或其他危险成分的垃圾不许单独存放。
C . 船舶应当按照国家有关规定以及中华人民共和国缔结或加入的国际条约的要求,设置与生活污水产生量相适应的处理装置或储存装置。
D . 国际航行船舶在驶离国内港口前应当将船上污染物清理干净,并在办理出口岸手续时向海事管理机构出示有效地污染物接收证明。

Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.空白(3)处填() A.hardware environment。 testingenvironment。 software environment。 business environment。 Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.空白(2)处填() A.main symptom。 rootproblem。 finalblueprint。 dataspecification。 Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.空白(1)处填() A.analysis phase。 designphase。 implementationphase。 maintenancephase。 Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating.空白(3)处填() A.project scope statement。 statement of work。 project management plan。 projectpolicy。 Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating.空白(2)处填() A.activity。 work。 currency。 time。 根据《中华人民共和国船舶及其有关作业活动污染海洋环境防治管理规定》,以下说法有误的:()
参考答案:

  参考解析

本题暂无解析

相关题目:

在线 客服