当前位置:高级网络规划设计师题库>专业英语题库

问题:

[单选,共用题干题]

Astute service providers realize that the continued support of legacy X.25 and asynchronous network element using separate operations network is cost(16).For example,the maintenance of multiple networks can require additional staff. Often, this staff must be trained on multiple vendor technologies, sometimes requiring parallel groups specializing in each (17) .Hence, additional maintenance procedures must be maintained and administrative records are (18) .The duplication of transport facilities to carry (19)network traffic is an inefficient use of resources. And not surprisingly, more technologies installed in a central office means the necessity for more physical space, and an increase in power connections and power consumption migration of these (20) network elements to IP-based DCns is alogical strategy.


空白处(20)应选择()

A . A.raditional
B . dominancy
C . redundancy
D . legacy

学生成绩表如下表所示。若要计算学生各科成绩、总分和平均分各项的最高分,可先在C10单元格中输入(1),并(2)拖动填充柄至H10单元格,则可自动算出这些学生各科成绩、总分和平均分的最高分。 空白(2)处应选择() 向垂直方向。 向水平方向。 按住Shift键向垂直方向。 按住Shift键向水平方向。 When the system upon which a transport entity is running fails and subsequently restarts,the(21) information of all active connections is lost. The affected connections become half-open, as the side that did not fail does not yet realize the problem.The still active side of a half-open connections can close the connection using a(22)timer. This timer measures the time the transport machine will continue to await an (23) of a transmitted segment after the segment has been retransmitted the maximum number of times.When the timer (24),the transport entity assumes that either the other transport entity or the intervening network has failed. As a result, the timer closes the connection, and signals an abnormal close to the TS user. In the event that a transport entity fails and quickly restarts, half-open connections can be terminated more quickly by the use of the RST segment, the failed side returns an RST i to every segment i that it receives. When the RST i reaches the other side, it must be checked for validity based on the (25) number i, as the RST could be in response to an old segment. If the reset is valid, the transport entity performs an abnormal termination.空白处(22)应选择() A.give-up。 abandon。 quit。 connection。 When the system upon which a transport entity is running fails and subsequently restarts,the(21) information of all active connections is lost. The affected connections become half-open, as the side that did not fail does not yet realize the problem.The still active side of a half-open connections can close the connection using a(22)timer. This timer measures the time the transport machine will continue to await an (23) of a transmitted segment after the segment has been retransmitted the maximum number of times.When the timer (24),the transport entity assumes that either the other transport entity or the intervening network has failed. As a result, the timer closes the connection, and signals an abnormal close to the TS user. In the event that a transport entity fails and quickly restarts, half-open connections can be terminated more quickly by the use of the RST segment, the failed side returns an RST i to every segment i that it receives. When the RST i reaches the other side, it must be checked for validity based on the (25) number i, as the RST could be in response to an old segment. If the reset is valid, the transport entity performs an abnormal termination.空白处(21)应选择() A.data。 state。 signal。 control。 (1)越高,屏幕上图像的闪烁感越小,图像越稳定,视觉效果也越好。当前PC中该指标大多采用(2)Hz。空白(2)处应选择() 88。 75。 65。 55。 (1)越高,屏幕上图像的闪烁感越小,图像越稳定,视觉效果也越好。当前PC中该指标大多采用(2)Hz。空白(1)处应选择() 分辨率。 显存容量。 刷新频率。 色深。

Astute service providers realize that the continued support of legacy X.25 and asynchronous network element using separate operations network is cost(16).For example,the maintenance of multiple networks can require additional staff. Often, this staff must be trained on multiple vendor technologies, sometimes requiring parallel groups specializing in each (17) .Hence, additional maintenance procedures must be maintained and administrative records are (18) .The duplication of transport facilities to carry (19)network traffic is an inefficient use of resources. And not surprisingly, more technologies installed in a central office means the necessity for more physical space, and an increase in power connections and power consumption migration of these (20) network elements to IP-based DCns is alogical strategy.


空白处(20)应选择()
参考答案:

  参考解析

分析敏锐的供应商认识到,昂贵的成本不允许他们继续使用分隔的业务网络支持老版本的X.25协议和异步网络元素。例如,维护多个网络需要更多的人员。通常情况下,这些人员必须接受多家提供商的培训,有时甚至需要在每个平台上安排多个并行的工作团队。因此,必须维持额外的维护过程,且复制多个管理记录。成倍的传输设备用在交叉的网络通信中,这是资源的无效使用。而且,毫不奇怪的是,更多的技术安装在一个中心办公室,这意味着需要更大的物理空间,增大的电力连接和消耗。因此,把这些老的网络设备移植到基于IP的数据通信网络中是不符合逻辑的策略。

相关题目:

在线 客服