Refer to the exhibit. A partial routing configuration is shown. Complete the configuration so that only the default - network is redistributed from EIGRP 190 into EIGRP 212. Which ACL statement completes the configuration correctly? () access - list 100 permit ip 0.0.0.0 0.0.0.0 0.0.0.0 0.0.0 .0。 access - list 100 permit ip host 0.0.0.0 any。 access - list 100 permit ip any host 0.0.0.0。 A default -network cannot be redistributed between routing processes.。
铰孔的目的是:()。 提高孔的尺寸精度。 降低表面粗糙度。 提高硬度。 提高耐磨性。 提高表面粗糙度。
建设单位与供货商签订的钢材供货合同未约定交货地点,后双方对此没有达成补充协议,也不能依其他方法确定。则供货商备齐钢材后,()。 A.应将钢材送到施工现场 。 B.应将钢材送到建设单位的办公所在地 。 C.应将钢材送到建设单位的仓库 。 D.可通知建设单位自提。
You work as a network engineer for . You study the exhibit carefully. What happens when the switch 2 is connected to the rest of the network in the VTP domain Lab_Network?() Exhibit: The recently introduced switch 2 removes all configured VLANs throughout the VTP domain. 。 The recently introduced switch 2 creates a STP loop in the VTP domain.。 The recently introduced switch 2 switches over to VTP transparent mode in order to be included into the VTP domain.。 A trunk should be configured between the two switches in order to integrate 2 into the VTP domain.。 The recently introduced switch 2 adds one more VLAN to the VLAN database in the VTP domain.。
患者进行生物治疗出现流感样症状不正确的是:() 体温异常。 肢体乏力。 血压升高。 咽痛。 关节痛。
工程项目建设总进度计划是对工程项目从开始建设至竣工投产全过程的统一部署,其主要内容有()。