当前位置:土建知识竞赛题库

问题:

[问答题] 地基施工结束,宜在一个间歇期后,进行质量验收,间歇期由什么确定?

In order to prevent galvanic corrosion,an aluminum boat must be insulated from the davits and gripes. Which of the following is acceptable as an insulator?() ["Hard rubber","Canvas","Leather","Sponge rubber"] 灰土地基施工过程中应检查什么? In battery charging rooms,ventilation should be provided(). ["at the lowest point","near the batteries","at the highest point","only when charging is in progre"] 装载机最重要的安全装置是()。 ["制动器","后视镜","雨刷器","喇叭"] 基金投资管理作业流程包括的主要环节有()。 ["制定投资政策","进行证券分析","构造投资组合","基金绩效评价"] 地基施工结束,宜在一个间歇期后,进行质量验收,间歇期由什么确定?
参考答案:

  参考解析

本题暂无解析

在线 客服