当前位置:IBM(000-104)题库

问题:

[单选]

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.
Which infrastructure is required for the new HMC?()

A . An additional switch for the new HMC
B . Asynchronous adapters on the new HMC
C . The two 570 servers are directly connected to the new HMC
D . One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

Company.com is planning for an HACMP cluster and wants to know more about the network requirements. The plan is to use IPAT via IP aliasing and heartbeating via IP aliasing to preserve the corporate IP addresses. Currently the customer uses a separate VLAN for each individual subnet.  Which statement best describes how HACMP co-exists with VLAN’s in this configuration?()     All subnets in use by HACMP must be in the same VLAN.。  All subnets in sue by HACMP must be in a different VLAN.。  HACMP does not support multiple subnets when using heartbeating via IP aliasing.。  HACMP does not support the use of VLAN.。 对于正常的在建工程,一般应当按照在建工程的()来评估。 市场价格。 账面价值。 重置成本。 收益价格。 TPC软件由多个组件组成,下列哪一项不是 TPC Server 的组件:() CIMON Agent。 Data Server。 Device Server。 DB2 data repository。 土地的自然特性是土地固有的自然属性,主要有土地面积的()性、土地位置的()性、土地功能的()性、土地质量的()性。 A customer has an IBM System Storage DS8700 and wants to reach the highest possible throughput in the back-end for a storage-pool-striped volume out of an extent pool with 8 ranks.  Over how many device adapter pairs should a technical specialist spread the workload() 2。 4。 6。 8。

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.
Which infrastructure is required for the new HMC?()

参考答案:

  参考解析

本题暂无解析

在线 客服