某施工单位承担一土石坝施工任务,该单位对坝基开挖做了施工组织设计,坝基基坑深为5.2m,采用药壶爆破法施工,土方量为9000m3,平均运距为10km,合同工期为8天。该施工单位有甲、乙、丙液压挖掘机各4台、2台、2台,A、B、C自卸汽车各12台、30台、18台,挖掘机的机械利用率为0.9,自卸汽车的机械利用率为0.95,其主要参数见表1、表2。

若每天一个台班,按上述最经济组合,安排挖掘机和自卸汽车的型号数量不变,应安排多少台、何种型号的挖掘机和自卸汽车,可以完成施工任务?

黄某,因肾癌需行手术,其手术体位是() ["折刀位","抬高腰桥侧卧位","平卧位","侧卧位","俯卧位"] Which two statements describe good practices for an application developer to reduce lockingconflicts in Oracle database() ["Avoid coding unnecessary long-running transactions.","Allow the database to handle locks in default locking mode.","Always explicitly code the locks as per the requirement of the application.","Allow escalation of row locks to block locks if too many row locks cause problem."] 乔木修剪 For which of the following can you use Segment Shrink?() [" Heap tables"," Tables with function-based indexes"," Indexes"," Partitions and subpartitions"," None of the above"] Which smit fastpath should be used to configure Link Aggregation on a server?()   ["tcpip","linkAgg","failover","etherchannel"]

某施工单位承担一土石坝施工任务,该单位对坝基开挖做了施工组织设计,坝基基坑深为5.2m,采用药壶爆破法施工,土方量为9000m3,平均运距为10km,合同工期为8天。该施工单位有甲、乙、丙液压挖掘机各4台、2台、2台,A、B、C自卸汽车各12台、30台、18台,挖掘机的机械利用率为0.9,自卸汽车的机械利用率为0.95,其主要参数见表1、表2。

若每天一个台班,按上述最经济组合,安排挖掘机和自卸汽车的型号数量不变,应安排多少台、何种型号的挖掘机和自卸汽车,可以完成施工任务?
参考答案:

  参考解析

本题暂无解析

在线 客服