Click the Exhibit button. When designing a DWDM system with multiple amplified spans, a pre-amp is needed at Site B to (). offset the OADM loss at site B。 overcome the high multiplexer loss at site A。 amplify signal levels after the high loss through Fiber Span 1。 adjust add channels at site B to be at the same level as the passthrough channels。 ensure that the per channel power is higher than the minimum needed for the post-amp at Site B。
社会性情感包括什么?
固体润滑剂优点
“新中国文学”实际上是“解放区文学”继续和发展,而“解放区文学”则是()的直接产物。
建筑外墙外保温工程冬期施工最低温度不应低于()。 -5℃。 0℃。 5℃。 10℃。
在用起重机吊运钢管时,在起重机()范围内严禁站人。