A manufacturing customer has a requirement to add 12 additional dual-attached servers to theirexisting two Brocade 16 port SAN switches that have no more ports available. Which of thefollowing should be recommended to accommodate the current capacity requirements, allow forfuture growth and provide 8 and 4 Gb support?() two SAN16B 。 two SAN80B-4 。 two SAN24B-4 。 two SAN04B-R。
直接报酬
某工程整体2层地下室、主楼地上12层、裙房地上4层,钢筋混凝土全现浇框架剪力墙结构,填充墙由小型空心砌块砌筑。基础为整体筏板,地下室外墙为整体剪力墙混凝土刚性防水,外加SBS卷材防水层。平整场地结束后.施工单位马上进行了工程定位和测量放线,然后进行土方开挖工作。整个基坑采取大放坡开挖,土方开挖至设计要求时,项目总工程师组织监理进行基坑验槽。经钎探检查,发现基坑内裙房部位存在局部软弱下卧层,项目总工召开现场会议,经协商决定采取灌浆补强,并按要求形成相关验收记录。本工程测量定位及放线应检查哪些内容?
A customer wants to put all their data on Solid State Disk drives to get maximum throughput andhighest availability. They only have 400 GB of data and plan on growing that data at only 1% to2% per year. How many 300 GB SSD drives should the storage specialist recommend to meet thecustomer requirements?() 2。 3。 5。 6。
当利用参照物及比较法估测被评机组的重置成本时,需要考虑的重要参数有()。 设备交易的时间差别因素环境等。 设备的生产能力因素,包括年产量、单位时间产量。 设备所在地与参照物所在地的地区自然景观。 被评估设备所在地与参照物所在地同设备供应地的距离和通达条件。
You are managing an Oracle Database 11g database with the following backup strategy:1) On Sunday, an incremental level 0 tape backup is performed.2) Monday through Saturday, a cumulative incremental level 1 tape backup is performed. Which twostatements are true regarding the backups performed()