当前位置:IBM(000-151)题库

问题:

[单选] A customer requires an infrastructure to support disaster recovery of critical applications between two remote datacenters one in Tokyo and one in Beijing. The customer’s Recovery Point Objective (RPO) necessitates a six-hour window for a bandwidth of 100MB/s and a new Storage System for a total of 4TB of data. They estimate 100MB of new data produced hourly. What data synchronization method would be recommended to meet the requirements?()

A . Metro Mirror
B . Flashcopy
C . Global Mirror
D . Snapshot

Which  kinds of failures make the Data Recovery Advisor (DRA) generate a manual checklist?() Failure when no standby database is configured。 Failure because a data file is renamed accidentally。 Failure that requires no archive logs to be applied for recovery。 Failure due to loss of connectivity-for example, an unplugged disk cable。 造价工程师职业道德教育的自我教育,其具体内容包括职业义务教育、职业荣誉教育两个方面 Which of the following versions of AIX provide both multi-path I/O and dynamic LPAR?() AIX V5.2。 AIX V4.2。 AIX V4.3。 AIX V5.1。 清朝前期巩固对西藏地区管理的重要措施有()。①平定大小和卓叛乱②派驻藏大臣③设置宣政院④册封达赖、班禅⑤设总督、巡抚 ②④。 ①③。 ②④⑤。 ①③⑤。 A system does not have a nameserver defined for IP address resolution. What file does AIX use to determine the IP address of a remote system?() /etc/hosts。 /etc/names。 /etc/rc.tcpip。 /etc/resolv.conf。 A customer requires an infrastructure to support disaster recovery of critical applications between two remote datacenters one in Tokyo and one in Beijing. The customer’s Recovery Point Objective (RPO) necessitates a six-hour window for a bandwidth of 100MB/s and a new Storage System for a total of 4TB of data. They estimate 100MB of new data produced hourly. What data synchronization method would be recommended to meet the requirements?()
参考答案:

  参考解析

本题暂无解析

在线 客服