问题:
An AIX 5.3 customer has a Power 780 in a 2-meter (T42) rack. This rack needs to be moved six inches (15cm) to allow under-floor access.
What preparation for moving the rack will result in the least disruption to end-users?()
A . Initiate LPAR fallover to backup systems.
B . Use Live Partition Mobility to move the LPARs to other systems.
C . Use Live Application Mobility to move critical applications to alternate systems.
D . Back up all LPARS to a NIM server and restore them to other LPARs on other systems.
An AIX 5.3 customer has a Power 780 in a 2-meter (T42) rack. This rack needs to be moved six inches (15cm) to allow under-floor access.
What preparation for moving the rack will result in the least disruption to end-users?()