问题:
Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system.
For the given system,what is the first step in this process?()
A . Physically press the appropriate button on the system.
B . Physically disconnect and reconnect the power cable on the system.
C . Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.
D . Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.
Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system.
For the given system,what is the first step in this process?()
● 参考解析
本题暂无解析
相关内容
相关标签