当前位置:CCNP(642-813)题库

问题:

[判断题]

The network is displayed in the diagram below: 
 



You have just been hired by to help their main office expand. The main offices have enhanced their wiring closets with some Layer 3 switches. The new distribution layer switch has been installed and a new access layer switch cabled next to it. Your task is to configure the distribution layer and access layer 
switch with VTP to share VLAN information, then to configure inter-VLAN routing on the distribution layer switch to route traffic between the different VLANs that are configured on the access layer switches. 
VTP Domain Distribution 
VLAN Ids 20 31 
IP Addresses 172.16.71.1/24 172.16.132.1/24 
These are your specific tasks: 
1. Configure the VTP information with the distribution layer switch as the VTP server 
2. Configure the VTP information with the access layer switch as a VTP client 
3. Configure VLANs on the distribution layer switch 
4. Configure inter-VLAN routing on the distribution layer switch 
5. Specific VLAN port assignments will be made as users are added to the access layer switches in the future. 
6. All VLANs and VTP configurations are to completed in the global configuration 
To configure the switch click on the host icon that is connected to the switch be way of a serial console cable.

A . 正确
B . 错误

某换填工程,工期紧,换填面积广,淤泥层较厚且稠度大.该工程最适合采用的换填方法是()。 正确。 错误。 下列煤种中,挥发份最高的是()。 正确。 错误。 硬盘分区表中包含各分区的起止点、活跃标记、()等信息。 正确。 错误。 人文社会科学社会功能的实现,需要哪些特殊条件? 正确。 错误。 1919年6月28日中国巴黎和会代表团拒绝参加和会签字仪式,并发表声明:“媾和会议,对于解决山东问题,已不予中国以公道。中国非牺牲其正义公道爱国之义务,不能签字,中国全权愿竭诚布陈,静待世界公论之裁判。”此事件()。 正确。 错误。

The network is displayed in the diagram below: 
 



You have just been hired by to help their main office expand. The main offices have enhanced their wiring closets with some Layer 3 switches. The new distribution layer switch has been installed and a new access layer switch cabled next to it. Your task is to configure the distribution layer and access layer 
switch with VTP to share VLAN information, then to configure inter-VLAN routing on the distribution layer switch to route traffic between the different VLANs that are configured on the access layer switches. 
VTP Domain Distribution 
VLAN Ids 20 31 
IP Addresses 172.16.71.1/24 172.16.132.1/24 
These are your specific tasks: 
1. Configure the VTP information with the distribution layer switch as the VTP server 
2. Configure the VTP information with the access layer switch as a VTP client 
3. Configure VLANs on the distribution layer switch 
4. Configure inter-VLAN routing on the distribution layer switch 
5. Specific VLAN port assignments will be made as users are added to the access layer switches in the future. 
6. All VLANs and VTP configurations are to completed in the global configuration 
To configure the switch click on the host icon that is connected to the switch be way of a serial console cable.

参考答案:

  参考解析

本题暂无解析

在线 客服