问题:
A . when the boiler has been secured long enough for most solids to settle
B . when the boiler has been cooled to ambient temperature
C . only after raising the water level to within 0~5 inch of the high water cutout only
D . after bypassing the low pressure
● 参考解析
本题暂无解析
相关内容
相关标签