本工程量清单是根据招标文件中包括的、有合同约束力的图纸以及有关工程量清单的国家标准、行业标准、合同条款中约定的工程量计算规则编制。约定计量规则中没有的子目,其工程量按照有合同约束力的图纸所标示尺寸的数量计算。(注:按照有合同约束力的图纸所标示尺寸的理论净量计算。)
防噪音类
You have a login-path named "adamlocal" that was created by using the mysql_config_editor command. You need to check what is defined for this login_path to ensure that it is correct for you deployment. You execute this command: $mysql_config_editor print –login-path=adamlocal What is the expected output of this command?() The command prints all parameter for the login-path. The password is replaced with stars。 The command prints the encrypted entry for the login-path. The is only possible to see if an entry exists。 The command prints all parameters for the login-path. The password is shown only when you provide the –password option。 The command prints all parameters for the login-path. The password is printed in plain tex。
电压互感器二次回路为什么必须接地?
Which two files in the database can be configured for automatic backups by using the autobackupfeature in Recovery Manager (RMAN)() data files。 control files。 parameter file。 online redo log files。 server parameter file。
Your production database is running in the ARCHIVELOG mode and the ARCn process is functional. You have two online redo log groups. Which three background processes would be involved when a log switch happens?()