问题:
[单选] Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.
logical models 。physical models 。design models 。implementation models。
问题:
[单选] Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.
hardware and software specification。 system performance specification。 formal requirements definition。 general problem statement。
问题:
[单选] 某软件公司欲开发一个图像处理系统,在项目初期开发人员对需求并不确定的情况下,采用()方法比较合适。
瀑布式 。快速原型 。协同开发 。形式化。
问题:
[单选] 以下不具有"完成-开始"关系的两个活动是()。
系统设计,设计评审 。系统分析,需求评审 。需求评审,周例会 。确定项目范围,制定WBS 。
问题:
[单选] 某项目的主要约束是质量,为了不让该项目的项目团队感觉时间过于紧张,项目经理在估算项目活动历时的时候应采用(),以避免进度风险。
A.专家判断 。B.定量历时估算 。C.设置备用时间 。D.类比估算。
问题:
[单选] 下列有关广域网的叙述中,正确的是()。
广域网必须使用拨号接入 。广域网必须使用专用的物理通信线路 。广域网必须进行路由选择 。广域网都按广播方式进行数据通信 。
问题:
[单选] 作为乙方的系统集成项目经理与其单位高层领导沟通时,使用频率最少的沟通工具是()。
A.状态报告 。B.界面设计报告 。C.需求分析报告 。D.趋势报告 。
问题:
[单选] 国际标准化组织在ISO/IEC12207-1995中将软件过程分为三类,其中不包括()。
基本过程 。支持过程 。组织过程 。管理过程 。
A.基础设施 。B.组织的经验学习系统 。C.组织劳务关系标准 。D.招聘、培养、使用和解聘的指导方针 。
问题:
[单选] 下面关于企业资源规划(ERP)的叙述,不正确的是()。
ERP为组织提供了升级和简化其所用的信息技术的机会 。购买使用一个商业化的ERP软件,转化成本高,失败的风险也很大 。除了制造和财务,ERP系统可以支持人力资源、销售和配送 。ERP的关键是事后监控企业的各项业务功能,使得诸如质量、有效性、客户满意度、工作成果等可控 。